Pine Hurst Acres
PJM queue ID N06
Pine Hurst Acres (N06) is listed in the PJM interconnection queue as a 0 MW gas project in Northumberland County, PA. The filing names Hamilton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 1, 2005.
| Queue ID | N06 |
|---|---|
| Project name | Pine Hurst Acres |
| Status (as published) | In Service |
| Substation | Hamilton |
| Point of interconnection | Hamilton 12kV |
| County | Northumberland |
| State | PA |
| Voltage | 12 kV |
| Capacity | 0 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2005-03-01 |
| Source dataset | serial |
Same substation and county
Hamilton substation: 5 requests in the PJM queue, 2 active totaling 500 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1882 | Hamilton 230 kV | 500 | Battery | Active |
| AG1-482 | Hamilton Solar and BESS | 20 | Hybrid | Withdrawn |
| AE1-138 | Hamilton 115 kV | 13.2 | Solar | Withdrawn |
| X3-069 | Hamilton | 4 | Solar | Withdrawn |
Northumberland, PA: 36 requests in the PJM queue, 7 active totaling 129.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0.047 |
| MFO | 0.047 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.