Substation Scout

Germantown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
AC1-048 Brookview Solar I 115 13.3 Solar Withdrawn
AC2-053 Brookview Solar I 115 7.6 Solar Withdrawn
AE1-006 Brookview Solar I 115 7.6 Solar Withdrawn
V3-031 Germantown n/r 7.6 Solar Withdrawn
AG2-648 Germantown 13.2 kV 13.2 6.2 Solar Withdrawn
W3-168 Germantown 13.2 kV 13.2 5.7 Solar Withdrawn
AF2-102 PA Adams Ramsburg 13.2 1.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.