Ringoes substation interconnection queue
1 active project totaling 1.1 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Ringoes as the point of interconnection, all in NJ.
Target commercial operation dates as filed run from Dec 2012 to Jan 2017 (3 filings).
1active projects
1.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W2-064 | Ringoes Solar Farm | 34.5 | 3.8 | Solar | Withdrawn | Jun 2014 |
| W2-061 | Everitt Solar Farm | 12 | 1.1 | Solar | In Service | Jan 2017 |
| Y2-029 | Ringoes 12kV | 12 | 0.4 | Solar | Withdrawn | n/r |
| X2-078 | Ringoes | n/r | 0 | Solar | Withdrawn | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hunterdon County, NJ
- Clinton: 3 active, 949.4 MW of 5 filed
- Pleasant Valley: 3 active, 800 MW of 5 filed
- East Flemington: 1 active, 500 MW of 3 filed
- Frenchtown: 3 active, 7.9 MW of 6 filed
- Ringoes-US Bronze: 1 active, 3.8 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Buckeye-Ringoes: 1 active, 3.2 MW of 2 filed
- Flemington: 2 active, 2.3 MW of 3 filed
- Hawks: 1 active, 1.1 MW of 3 filed
- Glen Gardner: 1 active, 0.8 MW of 3 filed
- Franklin: none active of 7 filed
- Gilbert: none active of 5 filed
- Baptistown-Frenchtown: none active of 4 filed
- Milford: none active of 4 filed
- Lebanon: 1 active, 0 MW of 3 filed
- Baptistown-Frenchtown #2: none active of 2 filed
- Clinton-Round Valley: none active of 2 filed
- Franklin #2: none active of 2 filed
- Frenchtown-Rosemont: none active of 2 filed
- Rocktown 4.8kV: none active of 2 filed
Other PJM queue substations in Atlantic County, NJ
- Sayreville: 2 active, 1,555 MW of 8 filed
- Raritan River: 4 active, 1,060 MW of 8 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Dorothy - Lewis: 1 active, 300 MW of 3 filed
- Pequest River: 3 active, 165.9 MW of 5 filed
- Cumberland: 2 active, 97.5 MW of 10 filed
- Salem-Woodstown: 1 active, 25.3 MW of 2 filed
- Huron: 2 active, 8 MW of 6 filed
- Ontario: 2 active, 7.5 MW of 6 filed
- Carlls Corner: 1 active, 4.8 MW of 8 filed
- Egg Harbor Township: 1 active, 3.7 MW of 6 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Pleasantville: 1 active, 1.4 MW of 5 filed
- Absecon: 2 active, 0.9 MW of 2 filed
- Larrabee: none active of 11 filed
- BL England: none active of 8 filed
- Cardiff: none active of 8 filed
- Cedar: none active of 8 filed
- Lewis: none active of 5 filed
- Minotola: none active of 5 filed
All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.
Site Scanner