Substation Scout

Ringoes substation interconnection queue

1 active project totaling 1.1 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name Ringoes as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Dec 2012 to Jan 2017 (3 filings).

1active projects
1.1active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
W2-064 Ringoes Solar Farm 34.5 3.8 Solar Withdrawn Jun 2014
W2-061 Everitt Solar Farm 12 1.1 Solar In Service Jan 2017
Y2-029 Ringoes 12kV 12 0.4 Solar Withdrawn n/r
X2-078 Ringoes n/r 0 Solar Withdrawn Dec 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Hunterdon County, NJ

All 89 PJM queue filings in Hunterdon County, NJ.

Other PJM queue substations in Atlantic County, NJ

All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.