Substation Scout

Ringoes substation interconnection queue

1 active project totalling 1.1 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
1.1active MW
4total filed
Queue IDProjectkVMWResourceStatus
W2-064 Ringoes Solar Farm 34.5 3.8 Solar Withdrawn
W2-061 Everitt Solar Farm 12 1.1 Solar In Service
Y2-029 Ringoes 12kV 12 0.4 Solar Withdrawn
X2-078 Ringoes n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.