Wilcox-Paper City substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Wilcox-Paper City as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Aug 2022 to Jul 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-242 | Wilcox-Paper City 46 kV | 46 | 12 | Solar | Withdrawn | Aug 2022 |
| AF2-295 | Evergreen Solar | 46 | 12 | Solar | Withdrawn | Jul 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Adams County, PA
- Hunterstown: 4 active, 2,131.9 MW of 9 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Valley: 3 active, 111.9 MW of 10 filed
- Hunterstown-Lincoln: 1 active, 53.6 MW of 2 filed
- Claysburg: 1 active, 9.8 MW of 3 filed
- Orrtanna: 1 active, 1 MW of 5 filed
- Germantown: none active of 7 filed
- North Hanover: none active of 4 filed
- Watson: none active of 4 filed
- Lincoln: none active of 3 filed
- Oxford: none active of 3 filed
- Gardners: none active of 2 filed
- Gardners-Hunterstown: none active of 2 filed
- Hunterstown-Jackson: none active of 2 filed
- Tidd-Collier: none active of 2 filed
Other PJM queue substations in Elk County, PA
- Motion-Ridgeway: 1 active, 12 MW of 2 filed
- Forest: none active of 3 filed