Wilcox-Paper City substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Wilcox-Paper City as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Aug 2022 to Jul 2027 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-242 Wilcox-Paper City 46 kV 46 12 Solar Withdrawn Aug 2022
AF2-295 Evergreen Solar 46 12 Solar Withdrawn Jul 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Adams County, PA

All 86 PJM queue filings in Adams County, PA.

Other PJM queue substations in Elk County, PA

All 14 PJM queue filings in Elk County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first