Cedar substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).
8 PJM queue filings name Cedar as the point of interconnection, all in NJ.
Target commercial operation dates as filed run from Jun 2003 to Jun 2021 (8 filings).
Transmission owner as filed: AEC (1 filing).
0active projects
0active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X1-017 | Cedar 230kV | 230 | 93 | Offshore Wind | Withdrawn | Sep 2016 |
| T81 | Cedar 230kV | 230 | 70 | Offshore Wind | Withdrawn | Dec 2012 |
| W3-028 | New Jersey Offshore Wind Project | 230 | 45 | Offshore Wind | Withdrawn | Jan 2019 |
| T61 | Cedar | n/r | 8.3 | Other | Withdrawn | Apr 2009 |
| AF2-021 | Cedar 69 kV | 69 | 8 | Battery | Withdrawn | Jun 2021 |
| Y3-101 | Cedar 12kV | 12 | 1.9 | Solar | Withdrawn | Dec 2014 |
| K05 | Cedar 69kV | 69 | 0.1 | Gas | Withdrawn | Jun 2003 |
| AC1-202 | The Home Depot Store #0951 | 12 | 0 | Gas | Withdrawn | Dec 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Atlantic County, NJ
- Sayreville: 2 active, 1,555 MW of 8 filed
- Raritan River: 4 active, 1,060 MW of 8 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Dorothy - Lewis: 1 active, 300 MW of 3 filed
- Pequest River: 3 active, 165.9 MW of 5 filed
- Cumberland: 2 active, 97.5 MW of 10 filed
- Salem-Woodstown: 1 active, 25.3 MW of 2 filed
- Huron: 2 active, 8 MW of 6 filed
- Ontario: 2 active, 7.5 MW of 6 filed
- Carlls Corner: 1 active, 4.8 MW of 8 filed
- Egg Harbor Township: 1 active, 3.7 MW of 6 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Pleasantville: 1 active, 1.4 MW of 5 filed
- Ringoes: 1 active, 1.1 MW of 4 filed
- Absecon: 2 active, 0.9 MW of 2 filed
- Larrabee: none active of 11 filed
- BL England: none active of 8 filed
- Cardiff: none active of 8 filed
- Lewis: none active of 5 filed
- Minotola: none active of 5 filed
All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.
Other PJM queue substations in Ocean County, NJ
- Lakewood: 4 active, 543 MW of 6 filed
- Oyster Creek: 1 active, 35 MW of 6 filed
- Manitou-Pleasant Plains: 1 active, 8.2 MW of 2 filed
- Lakehurst: 1 active, 3 MW of 3 filed
- Larrabee: none active of 11 filed
- Manchester: none active of 2 filed
- Oyster Creek II: none active of 2 filed