Substation Scout

Cedar substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 8 with terminal status (shown greyed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
X1-017 Cedar 230kV 230 93 Offshore Wind Withdrawn
T81 Cedar 230kV 230 70 Offshore Wind Withdrawn
W3-028 New Jersey Offshore Wind Project 230 45 Offshore Wind Withdrawn
T61 Cedar n/r 8.3 Other Withdrawn
AF2-021 Cedar 69 kV 69 8 Battery Withdrawn
Y3-101 Cedar 12kV 12 1.9 Solar Withdrawn
K05 Cedar 69kV 69 0.1 Gas Withdrawn
AC1-202 The Home Depot Store #0951 12 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.