Cedar substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).

8 PJM queue filings name Cedar as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Jun 2003 to Jun 2021 (8 filings).

Transmission owner as filed: AEC (1 filing).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
X1-017 Cedar 230kV 230 93 Offshore Wind Withdrawn Sep 2016
T81 Cedar 230kV 230 70 Offshore Wind Withdrawn Dec 2012
W3-028 New Jersey Offshore Wind Project 230 45 Offshore Wind Withdrawn Jan 2019
T61 Cedar n/r 8.3 Other Withdrawn Apr 2009
AF2-021 Cedar 69 kV 69 8 Battery Withdrawn Jun 2021
Y3-101 Cedar 12kV 12 1.9 Solar Withdrawn Dec 2014
K05 Cedar 69kV 69 0.1 Gas Withdrawn Jun 2003
AC1-202 The Home Depot Store #0951 12 0 Gas Withdrawn Dec 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Atlantic County, NJ

All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.

Other PJM queue substations in Ocean County, NJ

All 55 PJM queue filings in Ocean County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first