0 active projects totaling 0 MW in the PJM queue, plus 11 with terminal status (shown grayed).
11 PJM queue filings name Larrabee as the point of interconnection, all in NJ.
Target commercial operation dates as filed run from Jan 2013 to Feb 2030 (9 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-129 | Larrabee 230 kV | 230 | 1,675.6 | Offshore Wind | Withdrawn | Feb 2030 |
| AD2-083 | Larrabee 230kV | 230 | 1,100 | Not reported | Withdrawn | n/r |
| AI2-130 | Larrabee 230 kV | 230 | 1,037.2 | Offshore Wind | Withdrawn | Feb 2030 |
| AI2-131 | Larrabee 230 kV | 230 | 703.8 | Offshore Wind | Withdrawn | Feb 2030 |
| E12 | Larrabee 230kV | 230 | 661 | Gas | Withdrawn | n/r |
| V3-026 | Larrabee 230kV | 230 | 550 | Not reported | Withdrawn | Jan 2013 |
| AI1-001 | Larrabee 230 kV | 230 | 369.6 | Offshore Wind | Withdrawn | Oct 2029 |
| AI2-132 | Larrabee 230 kV | 230 | 355 | Offshore Wind | Withdrawn | Feb 2030 |
| AE1-034 | Larrabee 230 kV | 230 | 310.2 | Wind | Withdrawn | Jun 2024 |
| AF2-072 | Larrabee 230 kV | 230 | 25 | Battery | Withdrawn | Mar 2023 |
| AG1-108 | Larrabee 230 kV | 230 | 25 | Battery | Withdrawn | Mar 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Larrabee (JCPL, 19 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Monmouth County, NJ
- Howell: 1 active, 6.5 MW of 2 filed
- Hornerstown-Windsor: 1 active, 1.9 MW of 2 filed
- Allenwood-Larrabee 2: 1 active, 1 MW of 2 filed
- Bennett-Farmingdale 2: 1 active, 0.7 MW of 2 filed
- Cardiff: none active of 8 filed
- Atlantic: none active of 4 filed
- Bennett-Farmingdale: 1 active, 0 MW of 2 filed
- Englishtown: none active of 2 filed
- Fairfield: none active of 2 filed
- Great Adventure: 1 active, 0 MW of 2 filed
- Great Adventure-Great Adventure Tap: none active of 2 filed
- Larabee - Atlantic: none active of 2 filed
- Larrabee Collector Station: none active of 2 filed
Other PJM queue substations in Ocean County, NJ
- Lakewood: 4 active, 543 MW of 6 filed
- Oyster Creek: 1 active, 35 MW of 6 filed
- Manitou-Pleasant Plains: 1 active, 8.2 MW of 2 filed
- Lakehurst: 1 active, 3 MW of 3 filed
- Cedar: none active of 8 filed
- Manchester: none active of 2 filed
- Oyster Creek II: none active of 2 filed
Other PJM queue substations in Atlantic County, NJ
- Sayreville: 2 active, 1,555 MW of 8 filed
- Raritan River: 4 active, 1,060 MW of 8 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Dorothy - Lewis: 1 active, 300 MW of 3 filed
- Pequest River: 3 active, 165.9 MW of 5 filed
- Cumberland: 2 active, 97.5 MW of 10 filed
- Salem-Woodstown: 1 active, 25.3 MW of 2 filed
- Huron: 2 active, 8 MW of 6 filed
- Ontario: 2 active, 7.5 MW of 6 filed
- Carlls Corner: 1 active, 4.8 MW of 8 filed
- Egg Harbor Township: 1 active, 3.7 MW of 6 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Pleasantville: 1 active, 1.4 MW of 5 filed
- Ringoes: 1 active, 1.1 MW of 4 filed
- Absecon: 2 active, 0.9 MW of 2 filed
- BL England: none active of 8 filed
- Cardiff: none active of 8 filed
- Cedar: none active of 8 filed
- Lewis: none active of 5 filed
- Minotola: none active of 5 filed
All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.