Hamilton 230 kV
PJM queue ID C01-1882
Hamilton 230 kV (C01-1882) is listed in the PJM interconnection queue as a 500 MW battery project in Loudoun County, VA. The filing names Hamilton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-1882 |
|---|---|
| Project name | Hamilton 230 kV |
| Status (as published) | Active |
| Substation | Hamilton |
| Point of interconnection | Hamilton 230 kV |
| County | Loudoun |
| State | VA |
| Voltage | 230 kV |
| Capacity | 500 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Hamilton substation: 5 requests in the PJM queue, 2 active totaling 500 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| N06 | Pine Hurst Acres | 0 | Gas | In Service |
| AG1-482 | Hamilton Solar and BESS | 20 | Hybrid | Withdrawn |
| AE1-138 | Hamilton 115 kV | 13.2 | Solar | Withdrawn |
| X3-069 | Hamilton | 4 | Solar | Withdrawn |
Loudoun, VA: 22 requests in the PJM queue, 10 active totaling 1,922.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Cedar Holdco LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 500.0 |
| MW capacity | 500.0 |
| MFO | 500.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/19/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.