Raritan River substation interconnection queue

4 active projects totalling 1,060 MW in the PJM queue, plus 4 with terminal status (shown greyed).

4active projects
1,060active MW
8total filed
Queue IDProjectkVMWResourceStatus
W4-009 Woodbridge Energy Center 230 725 Gas In Service
Y1-025 Raritan River 230kV 230 725 Gas Withdrawn
AG2-076 Raritan River 230 kV 230 660 Not reported Withdrawn
AF2-413 Woods Landing Energy Storage 115 250 Battery Engineering and Procurement
C01-1698 Raritan River 230 kV 230 85 Battery Active
AD1-113 Woodbridge Energy Center 230 75 Gas Withdrawn
C01-1012 Raritan River 230 kV 230 0 Battery Withdrawn
X4-005 Raritan River 230kV 230 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.