Dorothy - Lewis substation interconnection queue

1 active project totalling 300 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
300active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1465 Dorothy - Lewis 138 kV 138 300 Battery Active
AI2-070 Dorothy - Lewis 138 kV 138 150 Battery Withdrawn
AI2-071 Dorothy - Lewis 138 kV 138 150 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.