Dorothy - Lewis substation interconnection queue
1 active project totalling 300 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
300active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1465 | Dorothy - Lewis 138 kV | 138 | 300 | Battery | Active |
| AI2-070 | Dorothy - Lewis 138 kV | 138 | 150 | Battery | Withdrawn |
| AI2-071 | Dorothy - Lewis 138 kV | 138 | 150 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.