Substation Scout

Dorothy - Lewis substation interconnection queue

1 active project totaling 300 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Dorothy - Lewis as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Mar 2027 to Sep 2031 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEC (1 filing).

1active projects
300active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1465 Dorothy - Lewis 138 kV 138 300 Battery Active Sep 2031
AI2-070 Dorothy - Lewis 138 kV 138 150 Battery Withdrawn Mar 2027
AI2-071 Dorothy - Lewis 138 kV 138 150 Battery Withdrawn Mar 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in atlantic County, NJ

No other substation in atlantic County, NJ is named as a point of interconnection in the PJM queue.

All 1 PJM queue filings in atlantic County, NJ.

Other PJM queue substations in Atlantic County, NJ

All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.