Lincoln substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-028 | Lincoln 13.2 kV | 13.2 | 2.1 | Solar | Withdrawn |
| U4-040 | Lincoln 13.2kV | 13.2 | 2 | Gas | Withdrawn |
| W2-094 | Lincoln Solar Farm | 13.2 | 1.1 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.