Lewis substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-016 | Lewis 138 kV | 138 | 96 | Battery | Withdrawn |
| U1-056 | Lewis 138kV | 138 | 45.5 | Offshore Wind | Withdrawn |
| X2-037 | Lewis 138kV | 138 | 45.5 | Offshore Wind | Withdrawn |
| T185 | Lewis | n/r | 4 | Offshore Wind | Withdrawn |
| U2-044 | Lewis 138kV | 138 | 2.6 | Offshore Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.