Cardiff substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 8 with terminal status (shown greyed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
AI2-128 Cardiff 230 kV 230 1,204.5 Offshore Wind Withdrawn
AD2-084 Cardiff 230kV 230 1,100 Not reported Withdrawn
I11 Cardiff 230kV 230 450 Gas Withdrawn
AE2-251 Cardiff 230 kV 230 337.2 Offshore Wind Withdrawn
M03 Cardiff n/r 300 Gas Withdrawn
T82 Cardiff 230kV 230 70 Offshore Wind Withdrawn
AE2-314 Cardiff 230 kV 230 43.2 Solar Withdrawn
AI2-206 Cardiff 12 kV 12 1.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.