Substation Scout

BL England substation interconnection queue

1 active project totalling 121.4 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
121.4active MW
8total filed
Queue IDProjectkVMWResourceStatus
Y1-001 B.L. England Station 138 447 Gas Withdrawn
AF2-169 BL England 138 kV 138 155 Wind Withdrawn
AE1-104 Ocean Wind LLC 138 121.4 Offshore Wind Suspended
AI2-326 BL England 138 kV 138 94.6 Offshore Wind Withdrawn
AE2-023 BL England 138 kV 138 78.4 Offshore Wind Withdrawn
Y2-110 BL England 138kV 138 40 Gas Withdrawn
Y1-076 BL England 138kV 138 18.1 Gas Withdrawn
Y1-077 Cape May Energy Center (CMEC) 138 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.