Hunterstown-Jackson substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Hunterstown-Jackson as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Aug 2012 to Dec 2014 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X3-022 | Hunterstown-Jackson 138kV | 138 | 38 | Solar | Withdrawn | Dec 2014 |
| X3-034 | Hunterstown-Jackson 130kV | 130 | 0 | Solar | Withdrawn | Aug 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Adams County, PA
- Hunterstown: 4 active, 2,131.9 MW of 9 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Valley: 3 active, 111.9 MW of 10 filed
- Hunterstown-Lincoln: 1 active, 53.6 MW of 2 filed
- Claysburg: 1 active, 9.8 MW of 3 filed
- Orrtanna: 1 active, 1 MW of 5 filed
- Germantown: none active of 7 filed
- North Hanover: none active of 4 filed
- Watson: none active of 4 filed
- Lincoln: none active of 3 filed
- Oxford: none active of 3 filed
- Gardners: none active of 2 filed
- Gardners-Hunterstown: none active of 2 filed
- Tidd-Collier: none active of 2 filed
- Wilcox-Paper City: none active of 2 filed
Other PJM queue substations in Washington County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Wilson: 1 active, 300 MW of 6 filed
- Vanceville: 1 active, 200 MW of 2 filed
- Byron: 1 active, 43 MW of 3 filed
- Motion-Ridgeway: 1 active, 12 MW of 2 filed
- Clinton II: 1 active, 3.2 MW of 2 filed
- Windsor: none active of 5 filed
- Champion: none active of 3 filed
- Wylie Ridge: none active of 3 filed
- Smith-N. Fayette: none active of 2 filed
Site Scanner