Egg Harbor Township substation interconnection queue

1 active project totalling 3.7 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
3.7active MW
6total filed
Queue IDProjectkVMWResourceStatus
W2-030 1307 Doughty Road n/r 3.7 Solar In Service
W3-104 Egg Harbor Township 12kV 12 1.9 Solar Withdrawn
V4-066 Egg Harbor Township 12kV 12 1.4 Solar Withdrawn
W2-041 Egg Harbor Township n/r 1 Solar Withdrawn
AB2-108 Egg Harbor Township 12kV 12 0 Gas Withdrawn
W3-015 Egg Harbor Township n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.