Pleasantville substation interconnection queue
1 active project totaling 1.4 MW in the PJM queue, plus 4 with terminal status (shown grayed).
5 PJM queue filings name Pleasantville as the point of interconnection, all in Atlantic County, NJ.
Target commercial operation dates as filed run from Jan 2005 to Nov 2022 (5 filings).
1active projects
1.4active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| P35 | Pleasantville /AC LF Unit 2 | n/r | 2 | Gas | Deactivated | Jul 2006 |
| R07 | AC Landfill Energy Units 1-3 | n/r | 2 | Gas | Deactivated | Oct 2007 |
| V2-005 | Pleasantville 12kV | 12 | 1.9 | Gas | Withdrawn | Dec 2010 |
| L02 | Pleasantville / AC LF Unit 1 | 12 | 1.4 | Gas | In Service | Jan 2005 |
| AH1-638 | Pleasantville 12.47kV | 12.5 | 0.7 | Solar | Withdrawn | Nov 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Atlantic County, NJ
- Sayreville: 2 active, 1,555 MW of 8 filed
- Raritan River: 4 active, 1,060 MW of 8 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Dorothy - Lewis: 1 active, 300 MW of 3 filed
- Pequest River: 3 active, 165.9 MW of 5 filed
- Cumberland: 2 active, 97.5 MW of 10 filed
- Salem-Woodstown: 1 active, 25.3 MW of 2 filed
- Huron: 2 active, 8 MW of 6 filed
- Ontario: 2 active, 7.5 MW of 6 filed
- Carlls Corner: 1 active, 4.8 MW of 8 filed
- Egg Harbor Township: 1 active, 3.7 MW of 6 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Ringoes: 1 active, 1.1 MW of 4 filed
- Absecon: 2 active, 0.9 MW of 2 filed
- Larrabee: none active of 11 filed
- BL England: none active of 8 filed
- Cardiff: none active of 8 filed
- Cedar: none active of 8 filed
- Lewis: none active of 5 filed
- Minotola: none active of 5 filed
All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.