Substation Scout

Oxford substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Oxford as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jun 2015 to Jul 2022 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-279 Oxford 115 kV 115 26.4 Solar Withdrawn Oct 2021
Z1-114 Oxford 13kV 13 4 Gas Withdrawn Jun 2015
AG1-332 Oxford 13.2 kV 13.2 3.7 Solar Withdrawn Jul 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Adams County, PA

All 86 PJM queue filings in Adams County, PA.

Other PJM queue substations in York County, PA

All 76 PJM queue filings in York County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first