Sayreville substation interconnection queue
2 active projects totalling 1,555 MW in the PJM queue, plus 6 with terminal status (shown greyed).
2active projects
1,555active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G07_MTX1 | Neptune | 230 | 790 | Not reported | In Service |
| A15 | Red Oak CC1, CT1 - CT4 | 230 | 765 | Gas | In Service |
| A37 | Sayreville 230 kV | 230 | 749 | Gas | Withdrawn |
| X3-089 | Sayreville 230kV | 230 | 744 | Gas | Withdrawn |
| J08_MTX14 | Sayreville 230kV | 230 | 80 | Not reported | Withdrawn |
| E16 | Sayreville 230kV | 230 | 70 | Gas | Withdrawn |
| AC1-026 | Sayreville | n/r | 0 | Battery | Withdrawn |
| S68 | Sayreville 230kV | 230 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.