New Road substation interconnection queue
1 active project totalling 120 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
120active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-020 | New Road 230 kV | 230 | 150 | Battery | Withdrawn |
| AE2-019 | New Road Storage | 230 | 120 | Battery | Under Construction |
| AF1-066 | New Road 230 kV | 230 | 50 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.