Loudoun substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-285 Loudoun 230 kV 230 150 Battery Withdrawn
C01-1468 Loudoun 230 kV 230 100 Battery Withdrawn
AH2-241 Loudoun 115kV 115 45 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.