Substation Scout

Tidd-Collier substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AA2-041 Tidd-Collier n/r 225 Not reported Withdrawn
AE1-253 Tidd-Collier 345kV 345 50 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.