Substation Scout

Mechanicsburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI1-103 Mechanicsburg 138 kV 138 127.9 Solar Withdrawn
AG2-023 Mechanicsburg 12.47 kV 12.5 2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.