0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2021 to Dec 2029 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI1-103 Mechanicsburg 138 kV 138 127.9 Solar Withdrawn Dec 2029
AG2-023 Mechanicsburg 12.47 kV 12.5 2 Solar Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.