New Hope substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name New Hope as the point of interconnection, all in MD.
Target commercial operation dates as filed run from Dec 2016 to Dec 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Y1-087 | New Hope | n/r | 5.7 | Solar | Withdrawn | Dec 2016 |
| AH2-052 | New Hope 12.47 kV | 12.5 | 0 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wicomico County, MD
- Rockawalkin: 2 active, 8.9 MW of 4 filed
- Edgewood: 1 active, 3 MW of 2 filed
- Edgewood III: 1 active, 1.1 MW of 2 filed
- Laurel: none active of 5 filed
- Mt. Hermon: none active of 3 filed
- North Salisbury: none active of 3 filed
- Edgewood I: none active of 2 filed
- Edgewood II: none active of 2 filed
- Pemberton: none active of 2 filed
- Piney Grove-New Church: none active of 2 filed
Other PJM queue substations in Allegany County, MD
- Cumberland: 2 active, 97.5 MW of 10 filed
- Keeney-Steele: 1 active, 55.1 MW of 3 filed
- Frostburg: 3 active, 19.6 MW of 6 filed
- Dans Mountain: 1 active, 14 MW of 3 filed
- Bedington-Harmony Jct: none active of 2 filed
- Sandy Springs-High Ridge: none active of 2 filed
Site Scanner