Cumberland 2
PJM queue ID P06
Cumberland 2 (P06) is listed in the PJM interconnection queue as a 88.1 MW gas project in Cumberland County, NJ. The filing names Cumberland as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2016.
| Queue ID | P06 |
|---|---|
| Project name | Cumberland 2 |
| Status (as published) | In Service |
| Substation | Cumberland |
| Point of interconnection | Cumberland 230 kV |
| County | Cumberland |
| State | NJ |
| Voltage | 230 kV |
| Capacity | 88.1 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2016-06-01 |
| Source dataset | serial |
Same substation and county
Cumberland substation: 10 requests in the PJM queue, 2 active totaling 97.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| T54 | Cumberland Unit 1 | 9.4 | Gas | In Service |
| C01-2119 | Cumberland 230 kV | 280 | Battery | Withdrawn |
| AB2-102 | Cumberland | 225 | Gas | Withdrawn |
| AG2-308 | Cumberland 138 kV | 100 | Battery | Withdrawn |
| AF1-081 | Cumberland 230 kV | 96 | Solar | Withdrawn |
| AF2-022 | Cumberland 138 kV | 50 | Battery | Withdrawn |
| AE2-205 | Cumberland 230 kV | 46.8 | Solar | Withdrawn |
| AG2-297 | Cumberland 230 kV | 11.4 | Solar | Withdrawn |
| AG2-071 | Cumberland 12 kV | 1.8 | Solar | Withdrawn |
Cumberland, NJ: 94 requests in the PJM queue, 15 active totaling 1,148.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 102 |
| MW capacity | 88.1 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.