Substation Scout

Mountain substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA1-036 Mountain 230kV 230 180 Gas Withdrawn
AG1-484 Mountain 115 kV 115 20 Hybrid Withdrawn
AG2-025 Mountain 13.2 kV 13.2 2.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.