Allen substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 10 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2021 to Dec 2029 (10 filings).
Transmission owner as filed: AEP (3 filings).
0active projects
0active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-365 | Flatrock Creek Solar II | 345 | 60 | Solar | Withdrawn | Dec 2029 |
| AG2-400 | Allen 345 kV | 345 | 60 | Solar | Withdrawn | May 2029 |
| AF2-224 | Flatrock Creek Solar I | 345 | 42 | Solar | Withdrawn | Dec 2029 |
| AI2-116 | Allen 345kV | 345 | 24 | Solar | Withdrawn | Oct 2026 |
| AG1-366 | Flatrock Creek Storage I | 345 | 20 | Battery | Withdrawn | Dec 2029 |
| AG2-402 | Allen 345 kV | 345 | 20 | Battery | Withdrawn | May 2029 |
| AG2-408 | Allen 345 kV | 345 | 18 | Solar | Withdrawn | May 2028 |
| AG2-024 | Allen 13.2 kV | 13.2 | 2.1 | Solar | Withdrawn | Dec 2021 |
| AH1-022 | Allen 13.2 kV | 13.2 | 2 | Solar | Withdrawn | Nov 2022 |
| AF2-101 | PA Cumberland Diehl | 13.2 | 1.8 | Solar | Withdrawn | Sep 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
6 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-19 | AG1-365 | Status change | n/a | Pending Termination → Withdrawn |
| 2026-10-19 | AF2-224 | Status change | n/a | Pending Termination → Withdrawn |
| 2026-10-19 | AG1-366 | Status change | n/a | Pending Termination → Withdrawn |
| 2026-09-21 | AG1-365 | Terminal status | 60 | Engineering and Procurement → Pending Termination |
| 2026-09-21 | AF2-224 | Terminal status | 42 | Engineering and Procurement → Pending Termination |
| 2026-09-21 | AG1-366 | Terminal status | 20 | Engineering and Procurement → Pending Termination |
Other PJM queue substations in Allen County, IN
- Convoy-East Lima: 1 active, 70 MW of 2 filed
- Milan: 2 active, 21 MW of 4 filed
- Sowers: none active of 3 filed
- Allen - RP Mone: none active of 2 filed
- Tillman: none active of 2 filed
Other PJM queue substations in Cumberland County, PA
- Cumberland: 2 active, 97.5 MW of 10 filed
- Roxbury: 1 active, 5.1 MW of 3 filed
- Carlisle Pike: 1 active, 2.9 MW of 2 filed
- Mountain: none active of 3 filed
- Mechanicsburg: none active of 2 filed
Site Scanner