Substation Scout

Sandy Springs-High Ridge substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Y3-030 Sandy Springs-High Ridge 230kV 230 127 Not reported Withdrawn
AE1-077 Sandy Springs-High Ridge 230 kV 230 100 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.