Substation Scout

Carlisle Pike substation interconnection queue

1 active project totalling 2.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
2.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1709 Carlisle Pike 23 kV 23 2.9 Gas Active
V4-076 Carlisle Pike 23kV 23 2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.