Home / PJM / substation / Keeney-Steele
Keeney-Steele substation interconnection queue
1 active project
totalling 55.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1 active projects
55.1 active MW
3 total filed
Queue ID Project kV MW Resource Status
AF2-360
Keeney-Steele 230 kV
230
75
Solar
Withdrawn
AB2-037
Cherrywood Solar I
230
55.1
Solar
Partially in Service - Under Construction
G00_MTX2B
Keeney-Steele 230kV
230
0
Not reported
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.