Bedington-Harmony Jct substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2009 to Jun 2010 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U4-018 | Bedington-Harmony Jct 138kV | 138 | 0 | Not reported | Withdrawn | Jun 2009 |
| V2-007 | Bedington-Harmony Jct 138kV | 138 | 0 | Not reported | Withdrawn | Jun 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Allegany County, MD
- Cumberland: 2 active, 97.5 MW of 10 filed
- Keeney-Steele: 1 active, 55.1 MW of 3 filed
- Frostburg: 3 active, 19.6 MW of 6 filed
- Dans Mountain: 1 active, 14 MW of 3 filed
- New Hope: none active of 2 filed
- Sandy Springs-High Ridge: none active of 2 filed