Allegany, MD interconnection queue
6 active projects totalling 190.6 MW in the PJM queue, plus 17 with terminal status (shown greyed).
6active projects
190.6active MW
23total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1874 | Ridgeley - Frostburg 138 kV | 138 | 150 | Battery | Active |
| AE1-077 | Sandy Springs-High Ridge 230 kV | 230 | 100 | Not reported | Withdrawn |
| AG2-308 | Cumberland 138 kV | 138 | 100 | Battery | Withdrawn |
| AF2-360 | Keeney-Steele 230 kV | 230 | 75 | Solar | Withdrawn |
| AH1-621 | Steele-Milford 230kV | 230 | 72 | Solar | Withdrawn |
| AG2-615 | Carlos Junction-Garrett 138 kV | 138 | 62.6 | Solar | Withdrawn |
| AH1-342 | Carlos Junction 138 kV II | 138 | 50 | Hybrid | Withdrawn |
| AI2-490 | Frostburg 138 kV | 138 | 31.9 | Wind | Withdrawn |
| AF1-044 | Wye Mills-Longwood 69 kV | 69 | 18.9 | Solar | Withdrawn |
| AI2-353 | Carlos Jct. – Ridgeley 138 kV | 138 | 16 | Wind | Withdrawn |
| S14 | Dans Mountain | n/r | 14 | Wind | In Service |
| AE2-309 | Jade Meadow | 34.5 | 11.9 | Solar | In Service |
| AE2-289 | Frostburg 138 kV | 138 | 11.8 | Wind | Active |
| AD1-018 | Pigtoe Bobcat Solar | 34 | 7.6 | Solar | Withdrawn |
| Z2-038 | Dan's Mountain Solar Project | 138 | 7.6 | Solar | Withdrawn |
| AE2-030 | Frostburg 138kV | 138 | 7.6 | Solar | Withdrawn |
| AB2-038 | Frostburg 138kV | 138 | 2.9 | Wind | In Service |
| AG2-409 | Granite 115 kV | 115 | 0 | Not reported | Withdrawn |
| AH2-019 | Not reported | n/r | 0 | Solar | Withdrawn |
| AH2-052 | New Hope 12.47 kV | 12.5 | 0 | Solar | Withdrawn |
| C01-1026 | Hancock 12.47 kV | 12.5 | 0 | Battery | Active |
| C01-1892 | Carlos Jct - Cresaptown 34.5 kV | 34.5 | 0 | Gas | Withdrawn |
| V2-007 | Bedington-Harmony Jct 138kV | 138 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.