Clinton substation interconnection queue

3 active projects totaling 949.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jun 2015 to Mar 2030 (4 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: DL (1 filing).

3active projects
949.4active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
X2-012 Patriot Generating Station 230 765 Gas In Service Jul 2016
C01-1233 Clinton 138 kV 138 180 Battery Active Mar 2030
G49 Clinton 69kV 69 10 Gas Withdrawn n/r
AC2-168 Gaucho Solar 23 4.4 Solar In Service Jun 2023
X4-043 Allerton Road Solar Farm n/r 3 Solar Withdrawn Jun 2015

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Lycoming County, PA

All 20 PJM queue filings in Lycoming County, PA.

Other PJM queue substations in Allegheny County, PA

All 64 PJM queue filings in Allegheny County, PA.

Other PJM queue substations in Washington County, PA

All 27 PJM queue filings in Washington County, PA.

Other PJM queue substations in Hunterdon County, NJ

All 89 PJM queue filings in Hunterdon County, NJ.