Substation Scout

Pleasant Valley substation interconnection queue

3 active projects totalling 800 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
800active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1911 Pleasant Valley 230 kV 230 300 Battery Active
AI1-149 Pleasant Valley 345 kV 345 250 Battery Withdrawn
C01-1387 Pleasant Valley 138 kV 138 250 Battery Active
C01-1488 Pleasant Valley 345 kV 345 250 Battery Active
AF1-109 Pleasant Valley 230 kV 230 20 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.