Pleasant Valley substation interconnection queue
3 active projects totalling 800 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
800active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1911 | Pleasant Valley 230 kV | 230 | 300 | Battery | Active |
| AI1-149 | Pleasant Valley 345 kV | 345 | 250 | Battery | Withdrawn |
| C01-1387 | Pleasant Valley 138 kV | 138 | 250 | Battery | Active |
| C01-1488 | Pleasant Valley 345 kV | 345 | 250 | Battery | Active |
| AF1-109 | Pleasant Valley 230 kV | 230 | 20 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.