Motion-Ridgeway substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Motion-Ridgeway as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Mar 2022 to Dec 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
12active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-385 | Motion-Ridgeway 46 kV | 46 | 15.4 | Solar | Withdrawn | Mar 2022 |
| AF1-153 | Jakes Hollow Solar | 46 | 12 | Solar | Suspended | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Washington County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Wilson: 1 active, 300 MW of 6 filed
- Vanceville: 1 active, 200 MW of 2 filed
- Byron: 1 active, 43 MW of 3 filed
- Clinton II: 1 active, 3.2 MW of 2 filed
- Windsor: none active of 5 filed
- Champion: none active of 3 filed
- Wylie Ridge: none active of 3 filed
- Hunterstown-Jackson: none active of 2 filed
- Smith-N. Fayette: none active of 2 filed
Other PJM queue substations in Elk County, PA
- Forest: none active of 3 filed
- Wilcox-Paper City: none active of 2 filed