Motion-Ridgeway substation interconnection queue

1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Motion-Ridgeway as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Mar 2022 to Dec 2027 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-385 Motion-Ridgeway 46 kV 46 15.4 Solar Withdrawn Mar 2022
AF1-153 Jakes Hollow Solar 46 12 Solar Suspended Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Washington County, PA

All 27 PJM queue filings in Washington County, PA.

Other PJM queue substations in Elk County, PA

All 14 PJM queue filings in Elk County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first