Fairfield substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Sep 2014 to Jun 2023 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-398 Fairfield 12 kV 12 6 Solar Withdrawn Jun 2023
W3-045 Fairfield at Howell Solar Farm 12 1.1 Solar Withdrawn Sep 2014

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.