Fairfield substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Sep 2014 to Jun 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-398 | Fairfield 12 kV | 12 | 6 | Solar | Withdrawn | Jun 2023 |
| W3-045 | Fairfield at Howell Solar Farm | 12 | 1.1 | Solar | Withdrawn | Sep 2014 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Lycoming County, PA
- Linden: 10 active, 1,980.1 MW of 20 filed
- Clinton: 3 active, 949.4 MW of 5 filed
- Hughesville: 3 active, 200 MW of 6 filed
- Saegers: 2 active, 30 MW of 3 filed
- Clinton II: 1 active, 3.2 MW of 2 filed
- Lycoming-Lock Haven: none active of 4 filed
- Montgomery: none active of 2 filed
Other PJM queue substations in Monmouth County, NJ
- Howell: 1 active, 6.5 MW of 2 filed
- Hornerstown-Windsor: 1 active, 1.9 MW of 2 filed
- Allenwood-Larrabee 2: 1 active, 1 MW of 2 filed
- Bennett-Farmingdale 2: 1 active, 0.7 MW of 2 filed
- Larrabee: none active of 11 filed
- Cardiff: none active of 8 filed
- Atlantic: none active of 4 filed
- Bennett-Farmingdale: 1 active, 0 MW of 2 filed
- Englishtown: none active of 2 filed
- Great Adventure: 1 active, 0 MW of 2 filed
- Great Adventure-Great Adventure Tap: none active of 2 filed
- Larabee - Atlantic: none active of 2 filed
- Larrabee Collector Station: none active of 2 filed
Site Scanner