Westvaco substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Westvaco as the point of interconnection, all in Allegheny County, PA.
Target commercial operation dates as filed run from Aug 2008 to Jan 2009 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| S38 | Luke Paper | 138 | 0 | Coal | Deactivated | Jan 2009 |
| U3-017 | Westvaco 138kV | 138 | 0 | Coal | Withdrawn | Aug 2008 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Allegheny County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Springdale: 2 active, 613 MW of 4 filed
- Wilson: 1 active, 300 MW of 6 filed
- Dans Mountain: 1 active, 14 MW of 3 filed
- Brunot Island: none active of 4 filed
- Elrama-Mitchell: none active of 4 filed
- Neville: none active of 3 filed
- Pine Creek: none active of 3 filed
- Imperial-Joffre: none active of 2 filed
- Savage: none active of 2 filed
- Swickley - Ambridge: none active of 2 filed