Clinton-Round Valley substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Clinton-Round Valley as the point of interconnection, all in Hunterdon County, NJ.
Target commercial operation dates as filed run from Dec 2011 to Mar 2012 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W3-084 | Clinton-Round Valley 34.5kV | 34.5 | 6.3 | Solar | Withdrawn | Dec 2011 |
| X1-101 | Clinton-Round Valley 34.5kV | 34.5 | 3 | Solar | Withdrawn | Mar 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hunterdon County, NJ
- Clinton: 3 active, 949.4 MW of 5 filed
- Pleasant Valley: 3 active, 800 MW of 5 filed
- East Flemington: 1 active, 500 MW of 3 filed
- Frenchtown: 3 active, 7.9 MW of 6 filed
- Ringoes-US Bronze: 1 active, 3.8 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Buckeye-Ringoes: 1 active, 3.2 MW of 2 filed
- Flemington: 2 active, 2.3 MW of 3 filed
- Ringoes: 1 active, 1.1 MW of 4 filed
- Hawks: 1 active, 1.1 MW of 3 filed
- Glen Gardner: 1 active, 0.8 MW of 3 filed
- Franklin: none active of 7 filed
- Gilbert: none active of 5 filed
- Baptistown-Frenchtown: none active of 4 filed
- Milford: none active of 4 filed
- Lebanon: 1 active, 0 MW of 3 filed
- Baptistown-Frenchtown #2: none active of 2 filed
- Franklin #2: none active of 2 filed
- Frenchtown-Rosemont: none active of 2 filed
- Rocktown 4.8kV: none active of 2 filed
Site Scanner