Elrama-Mitchell substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| P56 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
| U4-031 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
| V1-005 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
| V1-006 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.