Wilson substation interconnection queue

1 active project totaling 300 MW in the PJM queue, plus 5 with terminal status (shown grayed).

Target commercial operation dates as filed run from May 2016 to Sep 2030 (6 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: DL (1 filing).

1active projects
300active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1568 Wilson 138kV 138 300 Battery Active Sep 2030
AA1-068 Wilson 34.5kV 34.5 2.3 Solar Withdrawn May 2016
AA1-080 Wilson 34.5kV 34.5 2.3 Solar Withdrawn Oct 2016
AA1-096 Wilson 12.5kV 12.5 2.3 Solar Withdrawn Oct 2016
AB1-078 Wilson 34.5kV 34.5 0 Battery Withdrawn Dec 2016
AB1-166 Wilson Battery Storage 23 0 Battery Withdrawn Aug 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Allegheny County, PA

All 64 PJM queue filings in Allegheny County, PA.

Other PJM queue substations in Washington County, MD

All 32 PJM queue filings in Washington County, MD.

Other PJM queue substations in Washington County, PA

All 27 PJM queue filings in Washington County, PA.