Substation Scout

Lycoming, PA interconnection queue

5 active projects totalling 832.7 MW in the PJM queue, plus 15 with terminal status (shown greyed).

5active projects
832.7active MW
20total filed
Queue IDProjectkVMWResourceStatus
X2-012 Patriot Generating Station 230 765 Gas In Service
AG2-417 Clinton 69 kV II 69 88 Hybrid Withdrawn
AF1-216 Lycoming-Lock Haven 69 kV 69 85.9 Solar Withdrawn
AI2-195 Lycoming-Lock Haven 69 kV 69 69.9 Solar Withdrawn
AI2-196 Lycoming-Lock Haven 69 kV 69 51.5 Solar Withdrawn
C01-1036 Marshall 230 kV 230 37.7 Wind Active
AF2-145 Lycoming-Lock Haven 69 kV 69 30.6 Solar Withdrawn
AF2-140 Patriot Generating Station 230 30 Gas In Service
AH1-707 Saegers 230 kV 230 30 Gas Withdrawn
AI2-434 Not reported n/r 20 Hybrid Withdrawn
G49 Clinton 69kV 69 10 Gas Withdrawn
AG2-398 Fairfield 12 kV 12 6 Solar Withdrawn
AH1-154B Hughesville 12 kV 12 3 Solar Withdrawn
W4-069 Lycoming n/r 3 Gas Withdrawn
AI1-129 Muncy 12 kV II 12 2.7 Hybrid Withdrawn
AG2-156 Montgomery 12 kV 12 2.6 Solar Withdrawn
U2-096 Lock Haven-Lycoming #1 69kV 69 1.5 Gas Withdrawn
AG2-155 Linden 12 kV 12 1.4 Solar Withdrawn
AA2-008 Patriot Generating Station 230 0 Gas In Service
K02 Laurel Hill 230 0 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.