Clinton 138 kV
PJM queue ID C01-1233
Clinton 138 kV (C01-1233) is listed in the PJM interconnection queue as a 180 MW battery project in Allegheny County, PA. The filing names Clinton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2030.
| Queue ID | C01-1233 |
|---|---|
| Project name | Clinton 138 kV |
| Status (as published) | Active |
| Substation | Clinton |
| Point of interconnection | Clinton 138 kV |
| County | Allegheny |
| State | PA |
| Voltage | 138 kV |
| Capacity | 180 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-03-01 |
| Source dataset | cycle |
Same substation and county
Clinton substation: 5 requests in the PJM queue, 3 active totaling 949.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X2-012 | Patriot Generating Station | 765 | Gas | In Service |
| AC2-168 | Gaucho Solar | 4.4 | Solar | In Service |
| G49 | Clinton 69kV | 10 | Gas | Withdrawn |
| X4-043 | Allerton Road Solar Farm | 3 | Solar | Withdrawn |
Allegheny, PA: 64 requests in the PJM queue, 11 active totaling 1,589.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | PA-202 LLC |
|---|---|
| Transmission owner | DL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 180.0 |
| MW capacity | 180.0 |
| MFO | 180.0 |
| Submitted date | 4/15/2026 |
| Last updated | 6/5/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.