Baptistown-Frenchtown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W4-026 Baptistown-Frenchtown 34.5kV 34.5 5.3 Solar Withdrawn
W3-081 Baptistown-Frenchtown 34.5kV 34.5 4.2 Solar Withdrawn
W2-085 Gombasi Solar Farm 34.5 3.8 Solar Withdrawn
X1-104 Baptistown-Frenchtown 34.5kV 34.5 0.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.