Vanceville substation interconnection queue
1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).
Target commercial operation dates as filed run from May 2028 to Dec 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: APS (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1174 | Vanceville 138 kV | 138 | 200 | Battery | Active | Dec 2030 |
| AI2-002 | Vanceville 138 kV | 138 | 150 | Battery | Withdrawn | May 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Vanceville (APS, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Washington County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Wilson: 1 active, 300 MW of 6 filed
- Byron: 1 active, 43 MW of 3 filed
- Motion-Ridgeway: 1 active, 12 MW of 2 filed
- Clinton II: 1 active, 3.2 MW of 2 filed
- Windsor: none active of 5 filed
- Champion: none active of 3 filed
- Wylie Ridge: none active of 3 filed
- Hunterstown-Jackson: none active of 2 filed
- Smith-N. Fayette: none active of 2 filed
Other PJM queue substations in Washington County, VA
- Wolf Hills: 2 active, 34 MW of 2 filed