Champion substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| N40 | Champion 345kV | 345 | 300 | Coal | Withdrawn |
| M26 | Beech Hollow | n/r | 150 | Gas | Withdrawn |
| T156 | Champion | n/r | 20 | Coal | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.