Substation Scout

East Flemington substation interconnection queue

1 active project totalling 500 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
500active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1875 East Flemington 230 kV 230 500 Battery Active
AF1-108 East Flemington 34.5 kV 34.5 20 Hybrid Withdrawn
AG1-496 East Flemington 34.5 kV 34.5 2.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.