Neville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-291 Emsworth Main Channel Hydroelectric Project 2 23 13.5 Hydro Withdrawn
AF2-367 Emsworth Back Channel Dam Hydroelectric Project 23 12 Hydro Withdrawn
AG2-234 Neville 23 kV 23 1.5 Hydro Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.