Lebanon substation interconnection queue
1 active project totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Oct 2011 to Jun 2028 (3 filings).
Transmission owner as filed: Dominion (1 filing).
1active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1093 | Lebanon 34.5 kV | 34.5 | 22.5 | Battery | Withdrawn | Jun 2028 |
| V4-001 | Lebanon Solar | 34.5 | 0 | Solar | In Service | Dec 2011 |
| W4-079 | Lebanon | n/r | 0 | Solar | Withdrawn | Oct 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in James City, VA
- Surry-Skiffes Creek: 1 active, 650 MW of 2 filed
- Light Foot: 1 active, 13.3 MW of 2 filed
- Lightfoot: 1 active, 12 MW of 2 filed
Other PJM queue substations in Hunterdon County, NJ
- Clinton: 3 active, 949.4 MW of 5 filed
- Pleasant Valley: 3 active, 800 MW of 5 filed
- East Flemington: 1 active, 500 MW of 3 filed
- Frenchtown: 3 active, 7.9 MW of 6 filed
- Ringoes-US Bronze: 1 active, 3.8 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Buckeye-Ringoes: 1 active, 3.2 MW of 2 filed
- Flemington: 2 active, 2.3 MW of 3 filed
- Ringoes: 1 active, 1.1 MW of 4 filed
- Hawks: 1 active, 1.1 MW of 3 filed
- Glen Gardner: 1 active, 0.8 MW of 3 filed
- Franklin: none active of 7 filed
- Gilbert: none active of 5 filed
- Baptistown-Frenchtown: none active of 4 filed
- Milford: none active of 4 filed
- Baptistown-Frenchtown #2: none active of 2 filed
- Clinton-Round Valley: none active of 2 filed
- Franklin #2: none active of 2 filed
- Frenchtown-Rosemont: none active of 2 filed
- Rocktown 4.8kV: none active of 2 filed
Site Scanner