Brunot Island substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Brunot Island as the point of interconnection, all in Allegheny County, PA.
Target commercial operation dates as filed run from Oct 2019 to Dec 2027 (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-485 | Brunot Island 138 kV | 138 | 55 | Battery | Withdrawn | Jun 2024 |
| AF2-384 | Brunot Island | 138 | 20 | Hybrid | Withdrawn | Dec 2027 |
| AF1-197 | Brunot Island 138 kV | 138 | 15 | Gas | Withdrawn | Oct 2019 |
| AF2-160 | Brunot Island 138 kV | 138 | 3.5 | Gas | Withdrawn | Apr 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Brunot Island (DLCO, 13 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Allegheny County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Springdale: 2 active, 613 MW of 4 filed
- Wilson: 1 active, 300 MW of 6 filed
- Dans Mountain: 1 active, 14 MW of 3 filed
- Elrama-Mitchell: none active of 4 filed
- Neville: none active of 3 filed
- Pine Creek: none active of 3 filed
- Imperial-Joffre: none active of 2 filed
- Savage: none active of 2 filed
- Swickley - Ambridge: none active of 2 filed
- Westvaco: none active of 2 filed