Windsor substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jun 2005 to Dec 2027 (5 filings).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
H08_W66 Windsor 138 kV 138 300 Gas Withdrawn Jun 2005
AF2-071 Windsor 230 kV 230 100 Battery Withdrawn Mar 2023
AI1-180 Windsor 69 kV 69 100 Hybrid Withdrawn Dec 2027
AH1-118 Windsor 25 kV 25 12 Solar Withdrawn Dec 2023
N37 Windsor 138kV 138 10 Wind Withdrawn Nov 2006

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Mercer County, NJ

All 28 PJM queue filings in Mercer County, NJ.

Other PJM queue substations in Brooke County, WV

All 8 PJM queue filings in Brooke County, WV.

Other PJM queue substations in Washington County, PA

All 27 PJM queue filings in Washington County, PA.