Lycoming-Lock Haven substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-216 | Lycoming-Lock Haven 69 kV | 69 | 85.9 | Solar | Withdrawn |
| AI2-195 | Lycoming-Lock Haven 69 kV | 69 | 69.9 | Solar | Withdrawn |
| AI2-196 | Lycoming-Lock Haven 69 kV | 69 | 51.5 | Solar | Withdrawn |
| AF2-145 | Lycoming-Lock Haven 69 kV | 69 | 30.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.